JKSKYLINE ABSEILING SERVICES +44 208 001 9897+44 208 001 9897

Time Management

Benefits  

The benefits with using rope access method compared with installing scaffolding are indicated below;

 

Cost Saving 

  • The cost of the project can be reduced potentially saving up to 50% of the total cost for access.

  • No hire costs (scaffold) for the duration of work when work are redundant due to programming or risk of adverse weather.

  • No additional cost for the access platform AND the additional cost of hiring tradesmen. JKSkyline teams of skilled technicians will carry out the work without the assistance of a scaffold.   

  • No planning permission permits subject to local authorities.

  • No traffic management cost when carrying out work on a structure over a Highways, i.e. bridge abutments.

Time Management

  • Efficient to undertake within hours to setup and ready for work.

  • The time it requires a scaffolding structure to be installed, our rope access technicians would have completed the job.

Others

 

  • Jkskyline have IRATA technician based in London which can be deployed to rig and descend to tall difficult to reach structures with minimal disruption. 

  • No traffic management is required as works are undertaken in areas which involve high level access.

Rope access is less distruptive when compared with other conventional methods to access areas that are difficult to reach. It is effective and efficient to utilise ropes access causing minimal disruptions to your organisation and its residents.

 

We will continue to provide professional services to our clients with our ability to manoeuver around complex structures across the UK. Please contact us today for a FREE assessment or if you require more information on the services we provide.

 

Fully insured with Public Reliability Insurance.

 

Scaffolding vs Abseiling

 

When compared with scaffolding to carry remedial work activities such as painting, masticing, pipeline activities. The time and duration of work is presented in a graph to illustrate the difference result when compared with scaffolding and using abseiling to conduct work.

 

The cost will also increase significantly for an example installing scaffolding surrounding a 9 floor building to undertake masticing activities will cost on average 5,000 – 8,000 pounds exclude labours and materials in London. For abseiling cost will average around 1,800 – 2,500 pounds.   

 

    Why Choose Us

  • Comparison
  • Customer testimonials

 

 

 

     Products

  • Painting and Decorations
  • Structure and Building Inspection (General, Principal Inspection)
  • Eye bolt testing and installation,
  • Window cleaning,
  • Cabling,
  • Roof Repairs
  • Signage installation,
  • Jet / power wash to remove and clear unwanted staining to buildings,
  • Waterproofing & Masticing
  • Brickwork Repointing
  • and many more

 

 

 

    About Us

 

 

 

    FAQs

  • Question and Answers

 

 

Print | Sitemap
© JK SKYLINE ABSEILING SERVICES Company Registration Number 08605995 www.jkskyline.co.uk / www.jkskyline.uk / www.jkskyline.com / Articles